Transforming WA's old railway corridors into world-class trails that connect communities, grow regional economies, and give everyone amazing places to ride.

Three cyclists with backpacks riding away down a leafy bush trail through tall trees.

WHAT IS A TRAIL TRAIL?

Rail trails are shared-use paths built on (or parallel to) former, disused, or underused railway corridors. Because they follow old railway alignments, rail trails provide gentle gradients and even surfaces, which makes them accessible to people of all ages and abilities.

Western Australia has over 2,000 kilometres of disused railway corridors across the south-west, largely intact and in public ownership. This presents a incredible opportunity to build a connected network of trails linking dozens of regional communities.

HOW COMMUNITIES BENEFIT

Evidence from completed rail trails across Australia and internationally demonstrates consistent economic, social, and environmental returns.

Riding is for everyone

500,000 West Australians ride a bike every week. Gentle gradients suit all ages and abilities. (NWCPS 2025)

shop with yellow awning

Cycle tourism spend

$799 million was spent by cycling visitors in WA in 2024. Seven in ten trips involving cycling took place in regional Australia.

$998 per trip

$998 average spend per overnight cycle trip, over 4 nights, landing in smaller towns off the highway. (TRA 2024)

LET'S BUILD

The Wadandi Track is now under construction thanks to the WA Government’s commitment of $17.5 million to complete the Track as part of its $165 million Outdoor Adventure Tourism package.

When complete in mid-2028, the Wadandi Track will form a continuous 109km long-distance rail trail from Busselton Jetty to Flinders Bay in Augusta (source: Wadandi Track Tourism Opportunities Report, 2026).

With one flagship trail now being delivered, now is the perfect time to plan for what to build next.

WestCycle has identified six rail trails to prioritise for development, and we are advocating for an ongoing funding program to deliver and maintain them.

Four riders on a flat red gravel rail trail through forest near Margaret River.

PRIORITY TRAILS FOR DEVELOPMENT

1. Albany to Nornalup Rail Trail

Total length: 115km
59%
Rider's view from an e-bike crossing a timber bridge over still water on the Denmark to Albany trail.

This trail runs through karri forest and farmland along the Southern Ocean. With nearly two-thirds already complete, building the remaining 47km sections will give Western Australia a coastal rail trail to match anything across Australia..(Image source: Trails WA)

2. Boddington to Narrogin Rail Trail

Total length: 127 km
Completed 9%
A numbat standing alert on leaf litter, striped back and bushy tail visible.

From the rolling hills of Boddington to the numbat haven of Dryandra Woodland and on to Narrogin, this trail will link one of WA's award winning trail towns to the Wheatbelt. (Image source: Explore Parks WA)

3. Wyalkatchem to Nungarin (Wheatbelt Way Rail Trail)

Total length: 76km
Completed 0%
Granite outcrop with a small rock pool overlooking golden Wheatbelt paddocks under a blue sky. Billyacatting Hill

The proposed 76km rail trail between Wyalkatchem and Nungarin follows a historic corridor through the north eastern Wheatbelt, showcasing small historic towns, big-sky landscapes and authentic country hospitality.(Image source: Shire of Trayning)

4. Bunbury to Northcliffe

Total length: 203km
Completed 2%
Cluster of delicate cream fungi growing on a moss-covered log in South West forest.

A 203km corridor runs the length of the South West passing orchards, karri forest, and old timber towns of Donnybrook, Balingup, Bridgetown, Greenbushes, Manjimup, Pemberton and Northcliffe. (Image source: Visit Northcliffe, WA)

5. Perth Hinterland Rail Trails

Total length: 83km
62%
Bridge in the forest with bikes leaning on it.

Take the train to Midland, Beckenham or Byford and then ride up to the Perth hills. Only 32km of new trails is needed to close the gaps between the metro bike path network and gravel trails on Perth's doorstep, including the Munda Biddi. (Image source: Trails WA)

6. Northam to Collie (Wheatbelt Rail Trail)

Total length: 321km
20%
Dead Man's Swamp at Lake Towerrinning - Astrid Volzke (Our Photo Stories) Shire of West Arthur

This corridor runs from the Kep Track near Northam, through the central Wheatbelt towns of York, Beverley, Brookton, Pingelly, Cuballing, Narrogin, Williams and Darkan to the forests and trails near Collie. Sixty-three kilometres, built by locals, is already open between Collie and Dardadine. (Image source: Astrid Volzke / Shire of West Arthur)

RIDE A TRAIL TODAY

Want to get out on a trail now? Explore trails already open across WA with route maps and advice from:

RESOURCES

Useful guides and toolkits for anyone working on a rail trail project.

REFERENCES

National Walking and Cycling Participation Survey, 2025

$799 million was spent by cycling visitors in WA in 2024. Seven in ten trips involving cycling took place in regional Australia. Source: Cycle tourism in Australia, 2025

Tourism Research Australia
Wadandi Track Tourism Opportunities Report, 2026

Tim Roach (Chair)

Elected Director | Off Road

Tim has been in senior leadership and strategic development roles for more than 20 years and is currently a project risk consultant, and a part time academic at Edith Cowan University.

He is a past Director of Executive Education in the School of Business and Law at Edith Cowan University and Assistant Commissioner and General Manager in the public service. He is an Accountant (FCPA) and previously sat on the Divisional Council of CPA Australia. Tim has been involved in racing mountain bikes, BMX and triathlon for many years, both as a father of two children who race and as a past and current bike racer.

Helen Sadler (Deputy Chair)

Independent Director

Helen is a Town of Cottesloe councillor and is the current Chair of WestCycle’s Transport Advisory Group.

A medical doctor, Helen is a strong active transport advocate with a focus on health outcomes and social well-being.