Latest News

KWINANA FWY PSP DIVERSION – PHASE 7 – Cockburn Central to Hope Road, North Lake

Updated 20 April 2020

Kwinana Freeway Principal Shared Path Diversion (Phase 7 – Cockburn Central Station to Hope Road, North Lake)

21 December 2019 to 20 April 2020
  • The PSP from Kentucky Ct to Farrington Rd is was reopened on 20 April 2020. Some finishing works are required.
  • Over the next 2 weeks the PSP access point north of Berrigan Drive will remain closed (the southern access point is open)
  • A detour around Cockburn Central from Armadale Rd to Kentucky Ct will remain as part of the Armadale Rd to North Lake Road Bridge project

As part of this project, the PSP was widened to 4m and built slightly west of where it currently sits, to the edge of the road reserve and the neighbouring properties. Some of the PSP access points have changed, with some upgraded and others closed permanently.

For more information on the changes in PSP access points, click here

The seventh phase of PSP detours will commence on 21 December 2019. This phase removes a large segment of the detour via Bibra Drive. Once implemented, cyclists and pedestrians will safely cross the rail freight line via a dedicated path on the new freeway bridge.

The PSP between Russell Road and Cockburn Gateway was opened in November 2019.

Works will recommence in 2020 to finalise the PSP upgrade from Cockburn Train Station to Farrington Road. Main Roads WA are aiming to finalise the upgrades with further reopenings due in April 2020.

Ongoing Detour
The Armadale to North Lake Road Bridge Project has now commenced. The existing PSP detour between Beeliar Drive and Kentucky Ct will remain in place to separate PSP users from construction activity during the building of the North Lake Road Bridge. Once the Bridge construction is complete, this section of PSP will be upgraded and reopened to the public. More details of the timeline of this detour will be released as they come available

 

For more information:
https://project.mainroads.wa.gov.au/home/current/kwinanafreewayrusselltoroe/Pages/default.aspx 

Contact:
Email: enquiries@mainroads.wa.gov.au
Facebook: https://www.facebook.com/MainRoadsWesternAustralia/
Phone: 138 138

Disclaimer – Please use this information as a guide and check the project website for up-to-date information

0
X